1. Determine the takt time first: No matter what the product is, it is made in the exact time it must be completed.
2. Unit process: only for one product, carry out the handling, assembly, processing and material collection of unit accessories.
3. Pilot: Creates a device that can tell the takt time by sight.
4. U-shaped production line: Arrange the equipment counterclockwise in the engineering sequence, and one person is responsible for the exit and entrance.
5. AB control: Only when there is no product in the current project and there is a product in the previous project, the project will be carried out.
6. Light signal: A device that communicates the abnormality of products in the production line process.
7. Post-engineering collection: The products of the production line should meet the needs of the post-engineering.